Nanjing Forever Sewage Treatment Equipments Co,.Ltd guarantees the goods with the best quality, the use of first-class technology and made with the best materials, and in full compliance with national, industry, corporate standards or contract specifications, to ensure that the equipment is properly installed, the normal operation and maintenance, With satisfactory performance over its useful life. After the completion of equipment manufacturing, equipment quality, performance requirements in accordance with the relevant standards and the provisions of the contract for detailed and comprehensive inspection, so that the quality requirements to the demand side, and issued a product quality certificate.
Site inspection and acceptance
Upon completion of the installation of the equipment, the Company will appoint engineers to instruct the equipment to run the test and inspection according to the requirements of the purchaser. If the test results show that the equipment performance is deviated from the original technical requirements due to equipment quality problems, the Company is responsible for settlement. If necessary, repeat the test until the requirements are met.
Installation guidance services
The installation of the equipment shall be in accordance with the detailed construction drawings prepared by the Company. The company in the installation process to provide supervision and guidance, responsible for confirming the completion of equipment installation, only to be confirmed before entering the next stage of debugging equipment.
Run the debugging instructions
After the installation of the equipment, the Company will supervise the trial operation of the demand side, and jointly formulate the pilot plan with the demand side and guide the pilot project.
Site technical services
In order to successfully put the equipment into operation, the Company appointed skilled, qualified technical personnel to the site for technical services.